Home IDE Tech > Case Study > How Enel Power Plant’s Cooling Tower Blowdown (CTBD) Effluent Reached 93.5% Recovery

IDE RESOURCES

Search the academy

  • All resources

Case Study

How Enel Power Plant’s Cooling Tower Blowdown (CTBD) Effluent Reached 93.5% Recovery

The IDE MaxH2O DESALTER demo unit was successfully operated with the San Isidro cooling tower blowdown effluent over six weeks of continuous operation in two phases of operation.

Enter your details to download the case study

Fields marked with * are mandatory
back