Case Study
How Enel Power Plant’s Cooling Tower Blowdown (CTBD) Effluent Reached 93.5% Recovery
The IDE MaxH2O DESALTER demo unit was successfully operated with the San Isidro cooling tower blowdown effluent over six weeks of continuous operation in two phases of operation.
Enter your details to download the case study
Fields marked with * are mandatory